Post by 700101 on Jun 15, 2019 16:28:39 GMT
|
|
|
Post by rif153 on Jun 15, 2019 17:06:29 GMT
Good to know that the Greater Anglia 360s will get a new lease of life, I always thought they were too good/young to be withdrawn from service. I take it the 360s are going to be used for London-Corby services once electrification is complete, I look forward to their refurbishment. I presume new diesel trains are going to be ordered to replace the Sprinters. If I've got this right then aren't the Meridians going to be withdrawn in favour of the Adelantes and Desiros. You can see why the DfT went for Abellio's bid which is very minimal when it comes to the need to purchase new trains
|
|
|
Post by TNL33036 on Jun 16, 2019 9:37:07 GMT
Also included in the staff briefing document it appears:
|
|
|
Post by snowman on Jun 16, 2019 11:09:56 GMT
Good to know that the Greater Anglia 360s will get a new lease of life, I always thought they were too good/young to be withdrawn from service. I take it the 360s are going to be used for London-Corby services once electrification is complete, I look forward to their refurbishment. I presume new diesel trains are going to be ordered to replace the Sprinters. If I've got this right then aren't the Meridians going to be withdrawn in favour of the Adelantes and Desiros. You can see why the DfT went for Abellio's bid which is very minimal when it comes to the need to purchase new trains I think the Meridians will stay for a while, the short term problem is the non-PRM (persons of reduced mobility or disability regs) fleet, although I can easily see a few extra months derogation from the year end deadline to have compliant vehicles, including some of the IC125 fleet simply due to other new fleets being delayed. Anglia are unlikely to release 360s until it has enough Aventra and got rid of its own non-compliant trains
|
|
|
Post by snowman on Jul 19, 2019 19:48:27 GMT
|
|
|
Post by TNL33036 on Jul 30, 2019 13:59:08 GMT
|
|
|
Post by snowman on Jul 30, 2019 15:33:55 GMT
Per Railway Gazette, order is 33 5-car (24m car length) units Not a lot to replace 9 HSTs and 23 class 222 Meridans Even if assume 4 units are replaced on Corby services by electric units, and possibly 4 class 180 units (possibly temporary) operate some then effectively replacing 32 trains with only 33 half trains Sounds to me like Abellio have put in a bid based on insufficient trains, unless I am missing something, or many services will be short 5 car units Does seem daft to force your busy services to need two catering setups as using pairs of non-gangway units
|
|
|
Post by 700101 on Jul 30, 2019 18:35:29 GMT
Per Railway Gazette, order is 33 5-car (24m car length) units Not a lot to replace 9 HSTs and 23 class 222 Meridans Even if assume 4 units are replaced on Corby services by electric units, and possibly 4 class 180 units (possibly temporary) operate some then effectively replacing 32 trains with only 33 half trains Sounds to me like Abellio have put in a bid based on insufficient trains, unless I am missing something, or many services will be short 5 car units Does seem daft to force your busy services to need two catering setups as using pairs of non-gangway units Im led to believe there will be tighter turnarounds as the extra short HST sets only got taken on due to Thameslink timetable. Most will be doubled up.
|
|
|
Post by TNL33036 on Aug 12, 2019 21:20:19 GMT
First 158 in the “EMR Regional” branding:
(Credit to CEaston66).
|
|
|
Post by TNL33036 on Nov 21, 2019 20:18:22 GMT
|
|
|
Post by 700101 on Jul 5, 2020 18:30:56 GMT
Class 360 are currently getting there Mods done for 110mph in Northampton in readiness to transfer to EMR, some Q paths have been showing on real train times to/from Bedford North Siding but won’t happen for a while due to Covid and pending transfer of the first units, new timetable has also been pushed back to May 2021 which has also pushed back TL changes to there MML Bedford express services to additionally call at Harpenden and Leagrave
|
|
|
Post by MoEnviro on Jul 5, 2020 18:33:00 GMT
Class 360 are currently getting there Mods done for 110mph in Northampton in readiness to transfer to EMR, some Q paths have been showing on real train times to/from Bedford North Siding but won’t happen for a while due to Covid and pending transfer of the first units, new timetable has also been pushed back to May 2021 which has also pushed back TL changes to there MML Bedford express services to additionally call at Harpenden and Leagrave 2nd unit returned yesterday flic.kr/p/2jikpdJ One unit a week at the moment
|
|
|
Post by 700101 on Jul 29, 2020 20:55:59 GMT
The midland mainline OHL project up to Corby is almost complete so we may see Class 360 training begin towards end of year with EMR aiming for electric services to start around March 2021 which I’m gathering Luton/Bedford calls will start again during peak hours before there major timetable change in May 21. Class 180 are currently in storage with plans for Driver training to start soon in the mean time HST’s will carry on running for a bit longer
|
|
|
Post by TNL33036 on Aug 27, 2020 21:39:25 GMT
|
|
|
Post by 700101 on Nov 11, 2020 1:05:16 GMT
The first Class 360 has transferred from GA to EMR and is now at Cricklewood Depot
|
|