Post by M1104 on Dec 31, 2020 13:18:10 GMT
It's been reported that 95 stock 51597 is the first train to do a test run along the NLE to Nine Elms and Battersea Power Stations, this being done on Saturday December 19th during engineering hours. Fingers crossed that it all gose well. Hopefully there will be a clip of it on the NLE Train enthusiasts Geoff Marshall (from YouTube) comes to mind on that. lol Meanwhile this was taken on that mentioned Saturday, the end of the line at Battersea Power Station. Photo credit to David Zehetmayr
|
|
|
Post by richard on Dec 31, 2020 14:53:49 GMT
Fingers crossed that it all gose well. Hopefully there will be a clip of it on the NLE Train enthusiasts Geoff Marshall (from YouTube) comes to mind on that. lol Meanwhile this was taken on that mentioned Saturday, the end of the line at Battersea Power Station. Photo credit to David Zehetmayr Was that taken from a unit or a engineers train? I wouldn't be surprised if Mr Marshall was on that test train 😂
|
|
|
Post by M1104 on Dec 31, 2020 15:22:00 GMT
Train enthusiasts Geoff Marshall (from YouTube) comes to mind on that. lol Meanwhile this was taken on that mentioned Saturday, the end of the line at Battersea Power Station. Photo credit to David Zehetmayr Was that taken from a unit or a engineers train? I wouldn't be surprised if Mr Marshall was on that test train 😂 I'm not 100% sure but 'presumably' on that tube train, baring in mind they're earlier photos of the NLE tunnels prior to December 19th. I imagine (hoping) Mr Marshall would be on the first test train with 'private' passengers on board.
|
|
|
Post by M1104 on Jan 1, 2021 16:02:25 GMT
|
|
|
Post by M1104 on Jan 4, 2021 11:35:29 GMT
|
|
|
Post by routew15 on Jan 4, 2021 16:09:13 GMT
link to tweet Tom Edwards from BBC London has managed to get a clip 👍🏼
|
|
|
Post by richard on Jan 4, 2021 22:40:11 GMT
link to tweet Tom Edwards from BBC London has managed to get a clip 👍🏼 Shame it's just 10 seconds long would have like to see it leave the station.
|
|
|
Post by M1104 on Jan 4, 2021 22:43:09 GMT
|
|
|
Post by Busboy105 on Jan 4, 2021 23:08:37 GMT
Please tell me the tunnels will look like that when it opens?
|
|
|
Post by M1104 on Jan 5, 2021 0:51:44 GMT
Please tell me the tunnels will look like that when it opens? They will likely then be as dark as the rest of the Underground's tunnels
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Jan 28, 2021 6:49:55 GMT
Will there be platform edge doors like on the Jubilee line?
|
|
|
Post by Eastlondoner62 on Jan 28, 2021 10:06:07 GMT
Will there be platform edge doors like on the Jubilee line? I believe there won't initially, however provision is made for future PED installation
|
|
|
Post by adl on Mar 4, 2021 14:56:22 GMT
Where are the trains coming from for this extension? The Northern line will require extra trains?
|
|
|
Post by Dstock7080 on Mar 4, 2021 15:29:36 GMT
Where are the trains coming from for this extension? The Northern line will require extra trains? Some Kennington loop trains will be extended to Battersea, new timetable from ‘September’ should see 31tph to Morden.
|
|
|
Post by southlondonbus on Mar 4, 2021 20:23:46 GMT
Where are the trains coming from for this extension? The Northern line will require extra trains? Some Kennington loop trains will be extended to Battersea, new timetable from ‘September’ should see 31tph to Morden. Maybe the time the trains currently wait in the tunnel at Kennington will be used to get to Battersea but I still think some trains will have to come from somewhere. Perhaps a few High Barnet trains will be cut to Finchley Central and maybe a handful of Colindale trains rather then Edgware aswell.
|
|