Post by mkay315 on Jul 29, 2021 6:52:27 GMT
All in all I genuinely cannot wait until this line actually opens up all the way to relieve the pressure on the other lines. I know it will take many passengers from the Central, District, Circle, Hammersmith and City, Jubilee and Piccadilly lines.
|
|
|
Post by mkay315 on Jul 29, 2021 6:53:59 GMT
And of course some services being retained from the high level at Liverpool Street during peak times.
|
|
|
Post by capitalomnibus on Aug 3, 2021 0:45:18 GMT
I noticed on the 9-car trains that the selective door opening seems to have been setup very poorly, as more doors could be opened at certain stations. Towards Shenfield, Maryland there is no scope for any additional apart from front 7 cars. Forest Gate 1 door of car 8 opens up when it can have 2 doors open up. Manor Park only the front 7 cars open when it can have 1 door open in car 8. Seven Kings only 1 door opens in car 8, it appears it could have 2 open.
Why has this been setup so badly is a mystery.
|
|
|
Post by Dstock7080 on Aug 6, 2021 10:04:41 GMT
Paddington handed over to TfL this morning:
|
|
|
Post by wirewiper on Aug 11, 2021 8:04:29 GMT
There is to be a fresh consultation about extending the Elizabeth Line beyond Abbey Wood, noting that there is substantial development planned along the route to Gravesend. The following options are being proposed: 1 - Extend eight trains an hour over existing tracks to Dartford, four of which would continue to Gravesend. 2 - Extend all twelve trains to Dartford, over new tracks alongside the existing tracks. Four trains an hour would continue over existing tracks to Northfleet. 3 - No extension, but upgrades to the Southeastern and Thameslink services and new rapid bus links. The full consultation is here: www.abbeywood2ebbsfleet.com/index.php?contentid=60
|
|
|
Post by SILENCED on Aug 11, 2021 9:19:22 GMT
There is to be a fresh consultation about extending the Elizabeth Line beyond Abbey Wood, noting that there is substantial development planned along the route to Gravesend. The following options are being proposed: 1 - Extend eight trains an hour over existing tracks to Dartford, four of which would continue to Gravesend. 2 - Extend all twelve trains to Dartford, over new tracks alongside the existing tracks. Four trains an hour would continue over existing tracks to Northfleet. 3 - No extension, but upgrades to the Southeastern and Thameslink services and new rapid bus links. The full consultation is here: www.abbeywood2ebbsfleet.com/index.php?contentid=60But it is a consultation by a body without any power in the decision ... so in the grand scheme of things pretty useless
|
|
|
Post by redbus on Aug 11, 2021 18:32:46 GMT
All in all I genuinely cannot wait until this line actually opens up all the way to relieve the pressure on the other lines. I know it will take many passengers from the Central, District, Circle, Hammersmith and City, Jubilee and Piccadilly lines. Absolutely, and will hopefully generate passengers of its own. We need to get passengers back back after Covid and hopefully this wonderful spanking brand new line will encourage that. I want to see all the lines including the Elizabeth line busy and generating revenue for TfL.
|
|
|
Post by richard on Aug 11, 2021 21:32:01 GMT
TfL Rail/Crossrail unit pulls Init Tottenham Court Road on test 👇
|
|
|
Post by capitalomnibus on Aug 12, 2021 21:59:21 GMT
TfL Rail/Crossrail unit pulls Init Tottenham Court Road on test 👇 Funny it still says TfL rail service. It would be nice of them to let a 315 run through the tunnels just for celebration of a great rolling stock
|
|
|
Post by richard on Aug 12, 2021 22:08:03 GMT
TfL Rail/Crossrail unit pulls Init Tottenham Court Road on test 👇 Funny it still says TfL rail service. It would be nice of them to let a 315 run through the tunnels just for celebration of a great rolling stock Wouldn't that be great to see!
|
|
|
Post by mkay315 on Aug 12, 2021 22:54:13 GMT
TfL Rail/Crossrail unit pulls Init Tottenham Court Road on test 👇 Funny it still says TfL rail service. It would be nice of them to let a 315 run through the tunnels just for celebration of a great rolling stock 😂 👌
|
|
|
Post by wirewiper on Aug 13, 2021 7:49:52 GMT
It won't be named Elizabeth Line officially until the Central London section opens to the public.
|
|
|
Post by Dstock7080 on Aug 20, 2021 12:12:58 GMT
Whitechapel station will be handed over to TfL on Monday 23 August. The temporary entrance/exit on Court Street will close tonight and the Whitechapel Road building will reopen on Monday with step-free access to LU and LO platforms
|
|
|
Post by Green Kitten on Aug 20, 2021 13:24:40 GMT
Whitechapel station will be handed over to TfL on Monday 23 August. The temporary entrance/exit on Fulbourne Street will close tonight and the Whitechapel Road building will reopen on Monday with step-free access to LU and LO platforms Hopefully no more Crossrail engineering work at Whitechapel timetables 👀👀👀👀
|
|
|
Post by BE37054 (quoll662) on Aug 21, 2021 10:23:26 GMT
It won't be named Elizabeth Line officially until the Central London section opens to the public. Why did TfL name it TfL Rail originally?
|
|