Post by ServerKing on Jul 29, 2017 6:56:09 GMT
710 unit at Derby under construction I'm noticing an absence of wheels. Are these Maglev like trains in China? I will miss the loud whine of a 317 traction motor as it pulls away from Bruce Grove As for GOBLIN they are taking their time to put these wires up...
|
|
|
Post by Eastlondoner62 on Jul 30, 2017 13:28:45 GMT
While using the Goblin and c2c the other day I did realise that wires have been placed along the previously unelectrified stretch of track between the junction west of Barking and all along platform 1. The wires weren't present when the line had initially reopened.
|
|
|
Post by snoggle on Jul 30, 2017 14:40:03 GMT
While using the Goblin and c2c the other day I did realise that wires have been placed along the previously unelectrified stretch of track between the junction west of Barking and all along platform 1. The wires weren't present when the line had initially reopened. Oh yes they were. Only two pieces of wiring work were done in the initial blockade. The platform and access track at Barking and a short stretch at Gospel Oak. In each case it ties into existing wiring.
|
|
|
Post by Eastlondoner62 on Jul 30, 2017 14:43:40 GMT
While using the Goblin and c2c the other day I did realise that wires have been placed along the previously unelectrified stretch of track between the junction west of Barking and all along platform 1. The wires weren't present when the line had initially reopened. Oh yes they were. Only two pieces of wiring work were done in the initial blockade. The platform and access track at Barking and a short stretch at Gospel Oak. In each case it ties into existing wiring. oh were they? I wasn't paying much attention and must have not noticed them when the line reopened.
|
|
|
Post by snoggle on Jul 30, 2017 14:57:37 GMT
|
|
|
Post by ben on Aug 2, 2017 15:45:05 GMT
Ugly beasts aren't they. The livery style just doesnt suit.
|
|
|
Post by snoggle on Aug 30, 2017 13:09:16 GMT
|
|
|
Post by T.R. on Sept 25, 2017 11:34:25 GMT
Wires have appeared on the Eastbound line between Upper Holloway & Crouch Hill!
|
|
|
Post by snoggle on Sept 25, 2017 11:50:04 GMT
Wires have appeared on the Eastbound line between Upper Holloway & Crouch Hill! Nah! they must be fake. or not!
|
|
|
Post by T.R. on Sept 27, 2017 10:04:53 GMT
Update : Both tracks Upper Holloway - Crouch Hill are now wired.
|
|
|
Post by snoggle on Sept 27, 2017 10:19:05 GMT
Update : Both tracks Upper Holloway - Crouch Hill are now wired. Ta for the update. Almost doesn't look real after all the months of delays. Now we await the metal thieves to come along and rip it all down before it's energised.
|
|
|
Post by smoothcriminal on Sept 27, 2017 19:32:56 GMT
710 simulator is installed at willesden first use tomorrow.
|
|
|
Post by snoggle on Sept 27, 2017 19:58:46 GMT
710 simulator is installed at willesden first use tomorrow. That seems to be on schedule then if my vague memories of the rolling stock contract are correct.
|
|
|
Post by smoothcriminal on Oct 4, 2017 21:24:14 GMT
Word is the 710's are delayed not sure on timescales but month(s) were mentioned
|
|
|
Post by snoggle on Oct 4, 2017 22:23:49 GMT
Word is the 710's are delayed not sure on timescales but month(s) were mentioned Oh oh! Another little problem for Arriva and TfL to manage. Slightly surprised by this but only slightly. Still it potentially takes a little bit of pressure off Network Rail if trains aren't sitting in sidings waiting for wires to be switched on and tested.
|
|