Post by snoggle on Nov 11, 2013 19:43:51 GMT
Looks like Putney Bridge has to be closed for 6 months for repairs. Wandsworth Council have published a paper that sets out the issues. The preferred option, based on the available funding, is to fully close the bridge. TfL have indicated they will object given the impact of bus services and, in particular, Putney Garage. Pedestrians will be able to walk across the bridge during the works. Looks like fun times ahead.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Nov 11, 2013 19:46:08 GMT
Ill be the first to say this. AF is F***ED
|
|
|
Post by John tuthill on Nov 11, 2013 20:02:43 GMT
Looks like Putney Bridge has to be closed for 6 months for repairs. Wandsworth Council have published a paper that sets out the issues. The preferred option, based on the available funding, is to fully close the bridge. TfL have indicated they will object given the impact of bus services and, in particular, Putney Garage. Pedestrians will be able to walk across the bridge during the works. Looks like fun times ahead. Have we lost all our engineer capability? The bridge was widened before the first war and again in the 20's. Kingston bridge was widened without any loss of access. If it's so bad it needs closure, why not build a new one beside it? Brunel would be turning in his grave
|
|
|
Post by bengady3 on Nov 11, 2013 20:05:18 GMT
Traffic will be chaos A lot of bus routes will probably have long diversions
|
|
|
Post by John tuthill on Nov 11, 2013 20:10:24 GMT
Traffic will be chaos A lot of bus routes will probably have long diversions Another option would be to split the through routes? Remember 'The Petersham Hole'? Those routes from the south which terminate at Putney Bridge Station, some of them could use the 'Green Man'?
|
|
|
Post by l1group on Nov 11, 2013 20:20:48 GMT
Ill be the first to say this. AF is F***ED You aren't. In the paper, "London Buses" (Go-Ahead London General?) already said that about Putney Bus Garage - it would be, well according to the paper: Well, that's obvious!
|
|
|
Post by bengady3 on Nov 11, 2013 20:26:22 GMT
Traffic will be chaos A lot of bus routes will probably have long diversions Another option would be to split the through routes? Remember 'The Petersham Hole'? Those routes from the south which terminate at Putney Bridge Station, some of them could use the 'Green Man'? That could happen but it's just the space for the stands but it would be a good idea for routes like 93 and 85 because they pass the area
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Nov 11, 2013 21:16:37 GMT
Here is a solution.
14 Diverted to Hammersmith Broadway.
22 Diverted via Wandsworth Bridge Road, Wandsworth bridge, Wandsworth town, then via 270 to Putney Common
74 Curtailed at Putney Bridge Station
85 Curtailed at Putney Garage
93 Curtailed to Putney Garage
265 Extended to Wandsworth
270 Extended to Putney Common
220 Curtailed at Putney Bridge station
424 Curtailed at Putney Bridge station. Extended from Fulham to Hammersmith and then takes up 485 routing to Wandsworth
430 Diverted via Wandsworth Bridge and Fulham Broadway
N22 diverted as per 22
N74 follows 430 diversion
Routes 14 & 74 temporarily allocated to MW
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Nov 11, 2013 21:17:46 GMT
Here is a solution. 14 Diverted to Hammersmith Broadway. 22 Diverted via Wandsworth Bridge Road, Wandsworth bridge, Wandsworth town, then via 270 to Putney Common 74 Curtailed at Putney Bridge Station 85 Curtailed at Putney Garage 93 Curtailed to Putney Garage 265 Extended to Wandsworth 270 Extended to Putney Common 220 Curtailed at Putney Bridge station 424 Curtailed at Putney Bridge station. Extended from Fulham to Hammersmith and then takes up 485 routing to Wandsworth 430 Diverted via Wandsworth Bridge and Fulham Broadway N22 diverted as per 22 N74 follows 430 diversion Routes 14 & 74 temporarily allocated to MW 485 withdrawn
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Nov 11, 2013 21:18:59 GMT
170 diverted via telegraph inn
|
|
|
Post by Mokujin on Nov 11, 2013 21:32:05 GMT
Here is a solution. 14 Diverted to Hammersmith Broadway. 22 Diverted via Wandsworth Bridge Road, Wandsworth bridge, Wandsworth town, then via 270 to Putney Common 74 Curtailed at Putney Bridge Station 85 Curtailed at Putney Garage 93 Curtailed to Putney Garage 265 Extended to Wandsworth 270 Extended to Putney Common 220 Curtailed at Putney Bridge station 424 Curtailed at Putney Bridge station. Extended from Fulham to Hammersmith and then takes up 485 routing to Wandsworth 430 Diverted via Wandsworth Bridge and Fulham Broadway N22 diverted as per 22 N74 follows 430 diversion Routes 14 & 74 temporarily allocated to MW Doubt MW would have space for 14 and 74 and the dead mileage would be huge. Also not to mention a new bus type being introduced there (WVL/WHV).
|
|
|
Post by COBO on Nov 11, 2013 21:44:36 GMT
Here is a solution. 14 Diverted to Hammersmith Broadway. 22 Diverted via Wandsworth Bridge Road, Wandsworth bridge, Wandsworth town, then via 270 to Putney Common 74 Curtailed at Putney Bridge Station 85 Curtailed at Putney Garage 93 Curtailed to Putney Garage 265 Extended to Wandsworth 270 Extended to Putney Common 220 Curtailed at Putney Bridge station 424 Curtailed at Putney Bridge station. Extended from Fulham to Hammersmith and then takes up 485 routing to Wandsworth 430 Diverted via Wandsworth Bridge and Fulham Broadway N22 diverted as per 22 N74 follows 430 diversion Routes 14 & 74 temporarily allocated to MW 485 withdrawn But why withdraw route 485?
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Nov 11, 2013 21:56:22 GMT
Here is a solution. 14 Diverted to Hammersmith Broadway. 22 Diverted via Wandsworth Bridge Road, Wandsworth bridge, Wandsworth town, then via 270 to Putney Common 74 Curtailed at Putney Bridge Station 85 Curtailed at Putney Garage 93 Curtailed to Putney Garage 265 Extended to Wandsworth 270 Extended to Putney Common 220 Curtailed at Putney Bridge station 424 Curtailed at Putney Bridge station. Extended from Fulham to Hammersmith and then takes up 485 routing to Wandsworth 430 Diverted via Wandsworth Bridge and Fulham Broadway N22 diverted as per 22 N74 follows 430 diversion Routes 14 & 74 temporarily allocated to MW better to route the 265 to the Green Man via Putney Station
|
|
|
Post by snoggle on Nov 11, 2013 22:16:46 GMT
Here is a solution. 14 Diverted to Hammersmith Broadway. 22 Diverted via Wandsworth Bridge Road, Wandsworth bridge, Wandsworth town, then via 270 to Putney Common 74 Curtailed at Putney Bridge Station 85 Curtailed at Putney Garage 93 Curtailed to Putney Garage 265 Extended to Wandsworth 270 Extended to Putney Common 220 Curtailed at Putney Bridge station 424 Curtailed at Putney Bridge station. Extended from Fulham to Hammersmith and then takes up 485 routing to Wandsworth 430 Diverted via Wandsworth Bridge and Fulham Broadway N22 diverted as per 22 N74 follows 430 diversion Routes 14 & 74 temporarily allocated to MW I appreciate we're just having a little bit of fun here but surely anything running from the North will simply be curtailed at Putney Bridge station with passengers left to walk to the south side of the bridge? I suspect there might be a shuttle service between Putney Heath and Putney Common (assuming the stand can cope) or else the 265 is sent there to terminate. I agree the 85 and 93 will be cut short at the Garage - assuming the side road can cope. I'm doubtful the 14 would be sent to Hammersmith or the 22 sent round via Wandsworth - that would take a load of resource for revised schedules plus crew reliefs. The scheme is going to be immensely disruptive though - the stops along Putney High St are very busy and with buses starting at Putney Station or the north side of the bridge there are going to be a lot of people facing very inconvenient journeys. I can't imagine the local shop owners are pleased at the prospect of losing so much passing trade. Of course the Paper does include the clever move of Wandsworth saying "if TfL want to run a bus service so badly then they should stump up the extra £350k cost". Nice bit of "blackmail" there - especially as Wandsworth are paying nothing towards the work. Their £150k "contribution" will come from their LIP funding from TfL!
|
|
|
Post by DT 11 on Nov 11, 2013 23:09:45 GMT
Here is a solution. 14 Diverted to Hammersmith Broadway. 22 Diverted via Wandsworth Bridge Road, Wandsworth bridge, Wandsworth town, then via 270 to Putney Common 74 Curtailed at Putney Bridge Station 85 Curtailed at Putney Garage 93 Curtailed to Putney Garage 265 Extended to Wandsworth 270 Extended to Putney Common 220 Curtailed at Putney Bridge station 424 Curtailed at Putney Bridge station. Extended from Fulham to Hammersmith and then takes up 485 routing to Wandsworth 430 Diverted via Wandsworth Bridge and Fulham Broadway N22 diverted as per 22 N74 follows 430 diversion Routes 14 & 74 temporarily allocated to MW Too much hassle just make it simple, reduce Milage and cut off links as a bridge is being closed so things will cost more. 14, 22, 74 & (220) curtailed and terminate at Putney Bridge transferred to SW 39, 85, 93 curtailed and Stand in Putney Garage. 265 diverted to Putney Heath 270 to Putney Common Anyone who wants Putney Bridge can walk to East Putney and get the District Line with their existing ticket accepted. N22 & N74 diversion 333 to MW temp 87 AL & 170 to PL temp or 19 Part Allocation to NP temp and full N19 temp. 430 no replacement as it follows the 74, just the Roehampton Section covered instead extended to Wandsworth replacing the 220 for 6 months 424 run in two sections Putney Heath to Putney High Street using 1 bus AF Fulham Craven Cottage to Putney Bridge operated from SW all 424 tickets through to the District Line
|
|